Customer – Tier 1 Supplier

Plant – 1.4M sq ft with 3,200 team members
Annual Plant Revenue – $750M


Results

  • Spectrum restored Quality and Delivery ratings within 4 months with PPM < 100 and a Delivery score of 99.3%
  • Saved $1M a month by removing all third-party resources within 3 months
  • Reduced attrition and lowered absenteeism
  • Improved Pricing, Manufacturing, & Future Program structuring
  • Payback for investment in Spectrum was < 90 days
  • Installed systems and disciplines in the organization gave sustainable stability and profitability after Spectrum exited the engagement

Problem

  • Not meeting Customer expectations for Quality or Delivery score at 74%
  • Losing $9M/ month mostly in Premium Freight (in & out) + Direct Labor, and third-party resource costs

Solution Approach

  • Spectrum engaged to assess the situation and develop a containment plan to secure Quality & Delivery.
  • Spectrum assumed the General Manager position, Production Manager position(s), a 5-person Materials Expert Team, 3-person Quality Engineering Team and a Data Analyst position.
  • It was quickly determined that the immediate concerns were coming from poor organizational structure, direct labor attrition & absenteeism, poor capacity planning and inventory accuracy challenges.
  • The GM took complete accountability for Sales, Program Management and Manufacturing.
  • Structure & Personnel assessments led to a decentralized organization, recruitment of proper talent set personnel and dismissal of non-value added overhead.
  • Spectrum changed the shift patterns and wage structure.

Download Case Study

More Case Studies

Crisis Management
  • OT Reduction better than forecast within 2 weeks
  • Inventory accuracy improvement from 72% to 96%
  • Labor headcount reduction from 761 to 598
Crisis Management
  • Reduced weekly downtime by over 5 hours
  • Increased inventory accuracy by 22% in 3 weeks and achieved 98% within 5 weeks
  • Recruited and placed successful Plant Manager
Interim Materials Manager
  • Achieved targeted total inventory cost with a controlled reduction of $2.2M
  • Drove inventory accuracy improvements
  • Finished with 99.6% OTD score
Profit Improved
  • Monthly profit improved by 4%
  • Throughput improvement and schedule attainment
  • Customer downtime eliminated
Plant Turnaround
  • 26% EBIT improvement with Q4 EBIT at 13%
  • Elimination of unnecessary labor
  • Payback for investment in Spectrum < 90 days