Customer – Tier 1 Supplier

Plant – 1M sq ft with 1,300 team members


Results

  • Monthly profit improved by 4%
  • Throughput improvement and schedule attainment
  • Customer downtime eliminated
  • Based on customer downtime elimination alone, payback for investment in Spectrum ($1.2M) was three months

Problem

  • Customer downtime penalties of $500K a month
  • Struggling to maintain supply to their customer for the launch of a new model
  • Multiple examples of costly downtime for their customer due to component supply constraints

Solution Approach

  • Spectrum team of both operations leadership and materials leadership engaged to accelerate the turnaround and protect the OEM.
  • Spectrum redesigned the material flow and installed containment management of Tier 2 component suppliers.
  • Spectrum installed qualified first-line supervision on the plant floor as well as several operations management positions.
  • A “back to basics” approach was applied to improve throughput throughout the plant.
  • Planning and scheduling materials resources were installed to supplement the existing resources.
  • Spectrum remained on site with a small team in a continuous improvement mode as well as continued training of the client resources.

Download Case Study

More Case Studies

Crisis Management
  • OT Reduction better than forecast within 2 weeks
  • Inventory accuracy improvement from 72% to 96%
  • Labor headcount reduction from 761 to 598
Crisis Management
  • Reduced weekly downtime by over 5 hours
  • Increased inventory accuracy by 22% in 3 weeks and achieved 98% within 5 weeks
  • Recruited and placed successful Plant Manager
Interim Materials Manager
  • Achieved targeted total inventory cost with a controlled reduction of $2.2M
  • Drove inventory accuracy improvements
  • Finished with 99.6% OTD score
Restored Ratings
  • Spectrum restored Quality and Delivery ratings within 4 months with PPM < 100 and a Delivery score of 99.3%
  • Saved $1M a month by removing all third-party resources within 3 months
  • Reduced attrition and lowered absenteeism
Plant Turnaround
  • 26% EBIT improvement with Q4 EBIT at 13%
  • Elimination of unnecessary labor
  • Payback for investment in Spectrum < 90 days