Our Client’s Successes
Profit Improved
Customer – Tier 1 Supplier
Plant – 1M sq ft with 1,300 team members
Results
Monthly profit improved by 4%
Throughput improvement and schedule attainment
Customer downtime eliminated
Based on customer downtime elimination alone, payback for investment in Spectrum ($1.2M) was three months
Problem
Customer downtime penalties of $500K a month
Struggling to maintain supply to their customer for the launch of a new model
Multiple examples of costly downtime for their customer due to component supply constraints
Solution Approach
Spectrum team of both operations leadership and materials leadership engaged to accelerate the turnaround and protect the OEM.
Spectrum redesigned the material flow and installed containment management of Tier 2 component suppliers.
Spectrum installed qualified first-line supervision on the plant floor as well as several operations management positions.
A “back to basics” approach was applied to improve throughput throughout the plant.
Planning and scheduling materials resources were installed to supplement the existing resources.
Spectrum remained on site with a small team in a continuous improvement mode as well as continued training of the client resources.
Download Case Study
More Case Studies
Crisis Management
Customer – Tier 1 Supplier
OT Reduction better than forecast within 2 weeks
Inventory accuracy improvement from 72% to 96%
Labor headcount reduction from 761 to 598
READ MORE
Crisis Management
Customer – Tier 1 Supplier (Canada)
Reduced weekly downtime by over 5 hours
Increased inventory accuracy by 22% in 3 weeks and achieved 98% within 5 weeks
Recruited and placed successful Plant Manager
READ MORE
Interim Materials Manager
Customer – Tier 1 Supplier
Achieved targeted total inventory cost with a controlled reduction of $2.2M
Drove inventory accuracy improvements
Finished with 99.6% OTD score
READ MORE
Restored Ratings
Customer – Tier 1 Supplier
Spectrum restored Quality and Delivery ratings within 4 months with PPM < 100 and a Delivery score of 99.3%
Saved $1M a month by removing all third-party resources within 3 months
Reduced attrition and lowered absenteeism
READ MORE
Plant Turnaround
Customer – Tier 1 & Tier 2 Supplier
26% EBIT improvement with Q4 EBIT at 13%
Elimination of unnecessary labor
Payback for investment in Spectrum < 90 days
READ MORE